E-learning as an effective learning support
How to design new e-learning and how to connect it with face-to-face teaching? How to check what methods work in your course? Find out more in our e-learning workshop.
A test of fire alarm systems, alarms, and evacuation radios in individual buildings on July 26 and 28, and August 9.
At the turn of July and August, a coordinated inspection of fire safety equipment (EPS - electrical fire alarm system including associated fire protection systems) will be carried out in the buildings of the MU Faculty of Arts according to the following schedule:
As part of the control of fire safety equipment ("PBZ"), a "fire alarm" will be triggered via EPS with subsequent activation and control of downstream fire protection systems (according to the equipment of individual buildings), including activation of the evacuation announcement, which will call for leaving the buildings (it will be clearly audible even in the courtyards). During the test, the operation of lifts will be restricted and the electricity supply to the buildings will be partially disconnected (buildings A, B1, B2, and E).
During the test, the premises will be occupied by MUF maintenance personnel and, to the extent necessary, by companies inspecting downstream fire protection systems (PBZ).
How to design new e-learning and how to connect it with face-to-face teaching? How to check what methods work in your course? Find out more in our e-learning workshop.
The recent reduction in OneDrive capacity was also a topic of discussion.